Design-build for land you already own, or are about to buy: feasibility first, then a house designed to what the lot allows.


Amrami Design + Build designs and builds custom homes on lots our clients own across Chicago and the North Shore, from a 25-foot city lot with alley access to a teardown lot in Winnetka or a rare open parcel in Evanston. Our in-house team handles feasibility, architecture, permitting, and construction, so the house is designed to the lot and priced before you commit.
Published 2026 guides put the full span from evaluation to certificate of occupancy at roughly 12 to 20 months, with several months of design and permitting before 8 to 14 months of construction, and they are clear that the cost of bringing water, sewer, gas, and electric to the site is rarely included in the land price. The first weeks are spent finding out what the lot will let you build.
Land looks simple. These six are what a feasibility review finds, and finding them before you buy or design is the whole point.
The questions people ask first, answered directly. Cost figures are ranges from published 2026 industry guides, not quotes; your number comes from your project.
Published 2026 guides put Chicago-area custom homes at roughly $220 to $475 per square foot for construction, with the North Shore commonly $350 to $500 and up for finish-heavy homes. Site costs come on top: soil testing and survey, utility taps and trenching, demolition of an existing house, tree and stormwater compliance, and permit fees. Our cost guide walks through what moves the number, and we price your house against your lot before you commit.
It depends on zoning and use, minimum frontage and lot size, setbacks and easements, soil and drainage, and access to utilities, and guides list those as the standard buildability checks. A lot can be legal to build on and still too tight for the house you want once setbacks and coverage are applied. We run the review in the first weeks, and we will tell you if the answer is a smaller house or a different lot.
A short review before design: zoning analysis, survey and easements, soil test, utility availability, drainage, tree and demolition rules, and a concept sketch with a budget range. It costs a fraction of design fees and it is what keeps a family from designing a house the village will not approve.
Published 2026 guides put the full span at roughly 12 to 20 months from evaluation to certificate of occupancy: feasibility and design, permit review, then 8 to 14 months of construction. A teardown adds demolition and its own permit up front, and a historic district or a preservation review adds at least one cycle. Our timeline post lays out the three clocks.
Talk to a builder first if you can. A pre-purchase review of zoning, soil, and utilities is the cheapest month you will ever save, and it turns the lot search into a search for the right lot rather than the prettiest one.


In 2026 we completed a full design-build custom home in Evanston on one of the city’s few open lots, taken through zoning, permitting, and construction by our team. Across the North Shore our custom homes start the same way: with what the lot allows, then the house.
When the lot is fixed, the design has to bend to it, and the budget has to bend with the design. An architect working alone draws the house; a builder working alone prices it later; the lot’s surprises land between them. With one team, feasibility, design, and price are one conversation, and the house that is drawn is the house that fits.
Our in-house designers and builders work on every project together from the first meeting to the final walkthrough. You are never handed off between departments, and the person who promised the number is the person who has to hold it.




Send the listing or the survey. The first conversation is with the team that will design and build the house, and it is free.