Architectural design, interiors, and construction from one in-house team, so the house is priced while it is drawn.


Amrami Design + Build provides architectural design for custom homes in Chicago and the North Shore as part of a design-build team: our in-house designers develop the house from the first sketch through permit drawings, and the people who will build it sit in the same meetings. Interiors are designed alongside the architecture rather than after it.
Published 2026 guides put independent architect fees at roughly 8 to 15 percent of construction cost for a new house, and 10 to 20 percent for a remodel, so a $1 million home carries $100,000 to $150,000 in design fees before a builder has priced it. Design-build does not make design free. It makes design and price move together, which is where the savings and the predictability come from.
The traditional path, an architect first and a builder later, works when nothing changes. These six things are what change.
The questions people ask first, answered directly. Cost figures are ranges from published 2026 industry guides, not quotes; your number comes from your project.
Published 2026 guides put architect fees at roughly 8 to 15 percent of construction cost for a new custom home, and 10 to 20 percent for a remodel, with hourly rates of $125 to $250 and principals at $160 to $350. On a $500,000 build that is about $40,000 to $75,000; on a $1 million home, $100,000 to $150,000. In a design-build firm the design work is part of one contract and one price, developed alongside the construction estimate rather than before it.
No. The architectural design is done in-house and the permit set carries the professional seals your municipality requires. If you already have an architect or a set of drawings you love, we build from them too, and we will tell you honestly where the drawings and the budget disagree before you sign.
Understands how you live and what the lot allows, turns that into a concept, develops it into a full design, produces the construction documents the village reviews and the builder builds from, coordinates the engineers, and answers questions during construction. In our model every one of those steps happens with the builder in the room.
Published comparisons generally find fewer change orders and shorter schedules with design-build, because pricing happens during design rather than after it and there is no handoff between firms. The larger saving is usually not the fee; it is the redesign that never has to happen because the number was known all along. Our post on design-build compared with an architect and general contractor goes deeper.
Yes. We develop the design in 3D so you walk the plan, the elevations, and the interiors before construction documents are drawn, and every material and fixture is selected and priced before the permit set is finished. What you approve is what gets built.


Every home in our portfolio was designed and built by our in-house team, from a ground-up custom home in Evanston completed in 2026 to the French-inspired stone facade and indoor spa of Crafted Comfort in Chicago. The design-build process page walks through how a project moves from the first conversation to move-in.
A house is designed twice: once on paper and once in the field, when the plaster comes off or the soil report comes back. With an independent architect and builder, every one of those moments is a negotiation between firms. With one team, the designer, the estimator, and the builder adjust the plan and the price together, and the number holds.
Our in-house designers and builders work on every project together from the first meeting to the final walkthrough. You are never handed off between departments, and the person who promised the number is the person who has to hold it.




Bring the survey, the Pinterest board, or the drawings you already paid for. The first conversation is with the team that will design and build it, and it is free.