When the lot is right and the house is not: demolition, village review, and a new custom home from one design-build team.


Amrami Design + Build designs and builds custom homes on teardown lots across Chicago and the North Shore, and we tell families honestly when the house they own is worth renovating instead. Our in-house team handles the demolition permit, the village review, the architecture, and the construction, so the decision and the house come from one place.
Published 2026 guides put house demolition at roughly $3,000 to $25,000, or $2 to $17 per square foot, with Illinois permit fees around $300 for the first structure, and Chicago requires a notice of intent with fees paid at least ten working days before demolition. The number that matters more is the village: Winnetka’s Historic Preservation Commission can delay a demolition up to 270 days, Kenilworth reviews the historic significance of every teardown, and Evanston requires a Certificate of Appropriateness in its districts.
Demolition is the easy part. These six are what decide the schedule and the budget on a rebuild lot.
The questions people ask first, answered directly. Cost figures are ranges from published 2026 industry guides, not quotes; your number comes from your project.
Published 2026 guides put demolition of a house at roughly $3,000 to $25,000, or $2 to $17 per square foot, plus utility disconnects, permit fees near $300 for the first structure in Illinois, and any tree, stormwater, or preservation costs the village adds. The new house is then priced like any custom home: $220 to $475 per square foot in Chicago-area guides and $350 to $500 and up on the North Shore. Our cost guide covers what moves the number.
Tear down when the lot is right and the house is wrong: bad bones, a plan that cannot be fixed, or systems and structure that cost more to save than to replace. Renovate when the bones are good, the village is protective, or the house has what the street values. Published North Shore guides put a whole-home renovation of a 1920s house at $450,000 to $700,000 and up, and new construction usually above that for the same square footage. We price both when both are real options.
Demolition itself is days once permitted, but the permit, utility disconnects, and any village review come first, and in Winnetka a preservation delay can add up to 270 days. Then the new house follows a custom home timeline: design and engineering, permit review, and 8 to 14 months of construction. Plan on well over a year from purchase to move-in, and longer with a preservation review.
In most North Shore villages the answer is delay rather than stop. Winnetka can impose up to a 270-day delay on a significant house, Kenilworth reviews the historic significance of every demolition, and Evanston requires a Certificate of Appropriateness for landmarks and district houses. We check the status of a house before you buy the lot.
Yes. Chicago requires a demolition permit and a notice of intent with fees paid at least ten working days before work begins, plus utility disconnects and, in landmark districts, Landmarks review. Suburban villages each have their own demolition permit, and several add tree preservation and stormwater requirements.


Our custom homes across the North Shore start with the lot, whether it is a rare open parcel like our 2026 home in Evanston or a rebuild lot in Glencoe or Winnetka, and our town pages cover what each village asks of a teardown. When the house is worth saving, our historic renovation work is where we send you instead.
A teardown is two permits, a village review, a demolition contractor, and a new house, and the traditional model puts each with a different firm. When one team runs the demolition, the design, and the construction, the schedules overlap instead of queueing, and the surprises under the old house change one plan instead of three.
Our in-house designers and builders work on every project together from the first meeting to the final walkthrough. You are never handed off between departments, and the person who promised the number is the person who has to hold it.




Send the listing before you bid. The first conversation is with the team that will check the village rules, design the house, and build it, and it is free.